Leopoldov
Industrial and sewage / Biofuels
Deteriorated cleaning efficiency, few dysfunctional parts, or insufficient capacity of your wastewater treatment plant may not be the reason why you need to set up a brand new WWTP. Many existing wastewater treatment plants which can no longer perform at 100% can continue to function without difficulties if you let them refresh or intensify over time.
Our effort is to apply the latest knowledge of science, scientific and technological development in all projects of reconstruction and intensification of existing WWTPs so that all the capacities of an existing WWTP are used as economically as possible. In addition, Hydrotech is able to provide the reconstruction or intensification of existing WWTPs in full operation so you will not have to interrupt or limit production.
Wastewater treatment plant for the bakery is in the execution project stage. Capacity of WWTP is the same as for a city with approximately 22,000 inhabitants. Technology used within the plant is divided into 2 sections. The first one is a mechanical part involving rotary sieve, accumulation tank and flotation unit. The main function is to remove bigger particles from wastewater, equalize water quality and remove part of pollution. The second part of the WWTP is a biological stage, where water is treated up to the required parameters with help of activated sludge (microorganisms).
A model example of the design and gradual implementation of pre-treatment of industrial wastewater is a project for treatment of wastewater from textile industry. It is a production of textiles used mainly for hot air balloons. Most of the pollution comes from the dyeing line. The beginning of this project consisted of pilot tests of wastewater treatment using flotation, which lasted roughly 2 months. During this period the ability to remove pollution with such technology was demonstrated, so the customer ordered a proven solution.
One of our current customers is interesting because they produce ammunition. No industrial wastewater is produced directly in the production, but some volume is produced by employees and productions located near the factory. The project design involved effective use of existing tanks and transformation of biofilm technology into a conventional system of aerated and mixed tanks with suspended activated sludge.