Blog
Scraping device reconstruction for the WWTP settling tank with a capacity of up to 1,000 m3/h
Since November 2020, a system for scraping the bottom of the settling tank for a major producer of refinery, petrochemical and agrochemical products is already in permanent operation. Any reconstruction and thorough care of the technological equipment is very important for such an installation as the plant´s flow reaches up to 1,000 cubic meters per hour.

More articles
Tasty bakery products and wastewater in their production
Wastewater treatment plant for the bakery is in the execution project stage. Capacity of WWTP is the same as for a city with approximately 22,000...
How we saved tens of thousands of euros in the Russian brewery by replacing worn-out elements of the wastewater treatment plant
What amount of money did we help to save one brewery in Russia, where we rebuilt their wastewater treatment plant?