Since November 2020, a system for scraping the bottom of the settling tank for a major producer of refinery, petrochemical and agrochemical products is already in permanent operation. Any reconstruction and thorough care of the technological equipment is very important for such an installation as the plant´s flow reaches up to 1,000 cubic meters per hour.
More articles
Hydrotech attended the international conference of Paques company
Our long-time partner Paques organized the intern conference called Product & Sales conference 2019 at the end of the November and Hydrotech was...
Industrial wastewater recycling and reuse in production
The project implemented by Hydrotech several years ago in Kaluga, Russia, has had a longer start-up, however, its development has been quite...