Blog
Scraping device reconstruction for the WWTP settling tank with a capacity of up to 1,000 m3/h
Since November 2020, a system for scraping the bottom of the settling tank for a major producer of refinery, petrochemical and agrochemical products is already in permanent operation. Any reconstruction and thorough care of the technological equipment is very important for such an installation as the plant´s flow reaches up to 1,000 cubic meters per hour.
More articles
Malting plant wastewater – completion of WWTP pilot plant model monitoring
Every brewery needs malt from a malt house at the beginning of its production process. For such a food industry, we finished wastewater treatment...
Useful but harmful. How washing clothes made from synthetic materials causes ocean pollution?
Synthetic fibres have good elasticity, dry fast, and keep warm. However, if you wash them in a washing machine, you send out thousands of plastic...