Blog
Preparation for export of technological parts of the wastewater treatment plant to the U.S.
Intensive production, preparations and transportation planning for the U.S. project were taking place during last months in Hydrotech´s production halls. Parts of technology will be transported across Europe, then loaded onto a cargo ship in Polish harbour, subsequently sail across the ocean and travel thousands of kilometres across the USA from the east coast to North Dakota. To make it more “interesting”, one part of technology will be transported from Brazil.
More articles
Read more
What causes the WWTP's overload and how to solve this problem?
31.5.2018
Read important information about the consequences of overloading of WWTP's and possible solutions to these situations.