Blog

Dry and wet tests in progress

Even during the current situation in our company, we are preparing a wastewater treatment plant launch for a bakery near Dunajská Streda. As usual before putting technology in operation, during complex tests we tested correct electrical connection of all machines and their communication with the control system. We also set parameters of measuring devices (level meters, pH and oxygen probes, flow meters, etc.). For a smoother launch of devices, we invited our delivery partners to start the most important machines.

More articles

Read more

Is river pollution a global issue? Here is a list of world’s 8 most polluted rivers

11.9.2017

Following list shows rivers all around the world you don’t want to bath in, nor look at. Municipal waste and toxic contamination have already...

Read more

Evaluation of wastewater treatment process in the meat processing industry

16.10.2020

Meat products producers reached to us several times over the last few months. This time we were asked to evaluate used pre-treatment technology of...

Read more

Fertilizer production and wastewater irrigation. Rendering is greener than you might think

25.5.2022

Although the plant processes animal scraps, it's more environmentally friendly than you might think. Keep reading and find out why.