Blog

Anaerobic reactor start-up in the starch factory´s wastewater treatment plant

A waste water treatment plant in starch factory was built in Kaluga city (south of Moscow) two years ago. After stabilization of the production processes, a highloaded IC reactor was ready for start-up. Hydrotech technologists from Latvia, Russia and Slovakia faced several difficulties as low quality and activity of granular sludge, sludge washout, etc., but at the end of the day the process was successfully run in.

More articles

Read more

The ugly truth: how fast fashion pollutes our drinking water

28.3.2023

The fast fashion industry has become one of the biggest polluters of the environment including drinking water.

Read more

How to make the sludge dewatering process more efficient and better?

12.4.2019

By choosing the right chemicals, setting up the machine and proper dosing, you can achieve the desired cost reduction.

Read more

Up to 60% of Europe's rivers and lakes are contaminated, says the European Environment Agency

11.4.2019

The European Union Water Framework Directive 2000 program, after 18 years of operation, did not reach the results expected after its first phase.